Centre and Odisha review delays in National Waterway-5 development, focusing on land acquisition, clearances, navigation infrastructure and connectivity

OdishaPlus Bureau

National Waterway-5, NW-5 Odisha, Odisha waterways, Inland Waterways Authority of India, IWAI, Odisha infrastructure projects, Talcher Paradip waterway, Dhamra Port, Paradip Port, Odisha maritime development, waterway connectivity, Odisha logistics infrastructure, multimodal transport Odisha, Odisha port development, inland water transport India

The Centre and the Odisha government have reviewed key bottlenecks delaying the development of the 588-km National Waterway-5 (NW-5), with land acquisition, statutory clearances, infrastructure maintenance and availability of water for navigation emerging as major concerns.

The issues were discussed at a high-level meeting attended by Odisha Chief Secretary Anu Garg, Union Secretary for Ports, Shipping and Waterways Vijay Kumar, industry representatives and senior state government officials on Tuesday.

The proposed waterway comprises a 332-km riverine stretch connecting Talcher with Paradip and Dhamra, entirely within Odisha, and a 256-km canal stretch linking Dhamra with Geonkhali in West Bengal. The project is awaiting approval.

The meeting reviewed several pending matters requiring coordination between the Inland Waterways Authority of India (IWAI) and the state government. These include land acquisition and transfer for the construction of terminals and hydraulic structures, maintenance of existing assets and regulated release of water to ensure the required Least Available Depth (LAD) for navigation.

The development of the Khalpal Navigational Lock, construction and dismantling of bridges, last-mile road connectivity and shifting of high- and low-tension power lines were among the other issues taken up for discussion.

The proposed waterway is considered strategically important for strengthening Odisha’s multimodal transport network, reducing logistics costs and facilitating the movement of bulk commodities, particularly minerals and industrial goods.

The meeting also reviewed other major infrastructure proposals, including the Bahuda Muhan Port, the proposed shipbuilding cluster at Kenapara and a cruise terminal at Puri.

Assuring the Centre of the state’s full cooperation, Chief Secretary Anu Garg said Odisha was committed to facilitating the timely implementation of NW-5 and other strategic infrastructure projects.

These initiatives are expected to give a boost to industrial growth, port-led development, maritime connectivity and cruise tourism, while strengthening Odisha’s position as a major maritime and logistics hub on India’s eastern coast.

LEAVE A REPLY

Please enter your comment!
Please enter your name here